DSON. Enterprises

Pay for the power you use, not the power you waste.

We design and install automatic capacitor bank panels that improve your power factor, bring down KVAH readings and remove low-PF penalties from your electricity bill.

See what low power factor costs you

Move the slider. The load stays 100 kW; only the power factor changes.

Real power (kW), what you use Apparent power (kVA) kVAR
Apparent load (kVA)125
Wasted reactive (kVAR)75

Illustration of the physics only. Your actual bill depends on your tariff.

What we do

Supply, installation and commissioning for factories, commercial buildings and institutions across Maharashtra and India.

Automatic capacitor bank panels

APFC panels sized to your load. They switch capacitor steps automatically, so power factor stays high as your load changes through the day.

Low KVAH reading systems

Where billing is on KVAH, a low power factor raises your units. We correct it at the source so the meter records less apparent energy.

Smart power monitoring

IoT-based tracking of power factor, load and voltage, so you can see problems on your phone instead of finding them on the next bill.

Energy audits and consultancy

We read your bills and load pattern, find where energy is being lost, and give you a written improvement plan.

Panel servicing and upgrades

Failing capacitors, tripping contactors or a panel that no longer matches your load: we inspect, repair or replace.

Custom projects

Harmonic-filtered or detuned banks, and multi-incomer sites. Tell us what you have and we will propose a design.

How a project works

Four steps from your first message to a lower bill.

  1. Send your billShare a recent electricity bill by WhatsApp or email. It is enough for a first assessment.
  2. We analyse itWe check your power factor, KVAH and penalties, and estimate what correction can achieve.
  3. Site visit and designWe measure your load on site and propose the panel rating and quote.
  4. Install and commissionWe supply, install, test and hand over, then track the next bills with you.

Who this is for

Any site with a motor-heavy or inductive load is a candidate.

  • Factories and manufacturing units
  • Workshops, mills and fabrication shops
  • Commercial buildings and malls
  • Hospitals, schools and institutions
  • Cold storage, pumping and HVAC plants
  • Housing societies with lifts and pumps

Common questions

New to this? Read our plain-language guide to KVAH billing and power factor.

What is power factor?

It is the ratio of useful power (kW) to the total power your site draws (kVA). Motors, transformers and lighting ballasts pull extra reactive current, which pushes the ratio below 1.

Why does low power factor cost money?

Depending on your tariff, utilities may charge penalties for low power factor, or bill on kVAh, which rises as power factor falls. Correcting it lowers both.

How much can I save?

It depends on your current power factor, tariff and load. We estimate it from your bill before you commit to anything.

How long does installation take?

Most panels are installed and commissioned in a few days after the design is approved. Larger sites take longer.

Do you work outside Maharashtra?

Yes. We serve industries, commercial establishments and institutions across India.

Get a free bill review

Tell us about your site. We reply with an initial assessment, usually within one working day.

Phone / WhatsApp
+91 98210 43601

Email
sabnisled@gmail.com

This opens WhatsApp with your details filled in. Nothing is stored on this website.

WhatsApp